Battery Cell & ESS Accessories

Complete your battery pack or ESS system with Grade A accessories. Terminals, BMS acquisition boards, heating films, and mounting hardware — all matching XenPai cell specifications.

MOQ: 500pcs Lead Time: 2–3 weeks Custom Dimensions Available

Accessory Categories

🔌 Battery Terminals & Connectors

  • Aluminum Terminals (M8×14, M8×25)
  • Stainless Steel Terminals (M10×17, M12×23)
  • Copper Busbar Connectors
  • Insulation Covers & Boots

Materials: Aluminum 6061-T6, 304 Stainless Steel

📊 Voltage/Temp Acquisition Boards

  • Single Cell Acquisition Module
  • Multi-Channel Acquisition Board (4S–16S)
  • NTC Temperature Sensors
  • Wiring Harness Sets

Compatible with major BMS protocols

🔥 10A Heating Films

  • 10A DC Heating Film (12V/24V/48V)
  • Silicone Rubber Heating Pads
  • Self-Adhesive Backing
  • Custom Dimensions (50×50mm to 300×400mm)

Operating temp: -40°C to +80°C

🎒 Module Handles & Pull Tabs

  • Aluminum Die-Cast Handles (50kg load)
  • Plastic Reinforced Pull Tabs
  • Foldable/Retractable Designs
  • Mounting Hardware Included

Finish: Anodized or Powder Coated

🛡️ Insulation Plates & Spacers

  • FR4 Epoxy Insulation Plates
  • Nomex Paper Spacers (0.25–1.0mm)
  • Cell-to-Cell Separation Sheets
  • Custom CNC Cut Shapes

Dielectric strength: >15kV/mm

🔧 Mounting Brackets & Frames

  • Aluminum L-Bracket Sets
  • Adjustable Module Frames
  • End Plates & Compression Plates
  • Stainless Steel Tie Rods

Compatible with 50Ah–280Ah pouch cells

Connection Hardware & Fasteners

🔩 Bolts & Screws

M6, M8, M10 stainless steel bolts with washers and lock nuts. Grade 8.8 or A2-70.

⚡ Copper Bus Bars

T2 copper bus bars, nickel-plated or bare. Cross sections: 20×3mm to 100×10mm.

🔗 Connection Rings

Crimp-type copper rings and cable lugs, 10AWG to 2/0 AWG compatible.

Accessory Specifications Overview

Category Material Options MOQ Lead Time
Battery Terminals Al 6061-T6, SS 304, Copper 500 pcs 2–3 weeks
Acquisition Boards FR4 PCB, Silicone harness 100 sets 3–4 weeks
Heating Films Silicone rubber, PI film 200 pcs 2 weeks
Handles & Pull Tabs Al die-cast, PA66+GF 300 pcs 2–3 weeks
Insulation Plates FR4, Nomex, PET 500 pcs 1–2 weeks
Mounting Brackets Al 6063-T5, SS 304 200 sets 2–3 weeks
Hardware & Fasteners SS 304, T2 Copper 1,000 pcs 1 week

Why Source Accessories from XenPai

Cell-Compatible Design

All accessories designed and tested to match XenPai LFP/NMC cell dimensions and terminal configurations.

Consolidated Sourcing

Order cells and accessories together — single PO, single shipment, single point of contact for quality issues.

Custom Engineering

Need a non-standard terminal size or bracket configuration? Send your drawing — we machine to spec.

⚙️ Custom Dimensions & Configurations

Standard accessories are stocked for 50Ah, 100Ah, and 280Ah pouch cell formats. For custom pack designs or non-standard cell dimensions, provide your CAD drawing or sample — we manufacture terminals, brackets, and insulation plates to match within 10 working days.

Request Accessories Quote

Specify your pack configuration and cell model — we’ll recommend the complete accessory bill of materials with pricing and lead time.

Get Accessories Quote →

Or email directly: sales@batterypackline.com

Frequently Asked Questions

Q: Can I order accessories without ordering cells?

Yes, but accessories are priced and stocked primarily as cell complements. Standalone accessory orders under $500 may incur a small handling fee. We recommend consolidating with your cell order for best pricing and consolidated shipping.

Q: Are your terminals compatible with other manufacturers’ cells?

Our terminals are dimensioned for XenPai cell terminal positions and thicknesses. They may fit other pouch cells with similar geometries, but we cannot guarantee compatibility. Send a sample cell for verification if you’re using mixed sources.

Q: What’s the lead time for custom-machined terminals?

Custom aluminum terminals: 10 working days from drawing approval. Custom brackets and frames: 15 working days. We provide sample parts for fit-check before full production run.

Q: Do you provide installation torque specifications?

Yes. Every accessory shipment includes a datasheet with recommended torque values for terminals, mounting hardware, and electrical connections — matched to the materials and thread sizes provided.

Q: Are heating films necessary for all battery applications?

Heating films are only required if your battery operates below 0°C with any frequency. LFP cells lose significant capacity at low temperatures; the heating film pre-heats the cell to 10–15°C before charging to prevent lithium plating. If your ESS is indoor or temperate climate, heating films can be omitted.

Complete Your System

LFP & NMC Pouch Cells → Liquid-Cooled ESS → Outdoor ESS Cabinets →