Two XPG configurations with integrated battery clusters, BMS, PCS and EMS. Compare connection voltage, specified system energy and site requirements for your storage project.

The model briefs describe battery clusters, BMS, PCS and EMS integration. Agree actual equipment models, interfaces and responsibilities in the project quotation; transformer, switchgear, site cabling and civil works are not established by the model name.
Both models use 314 Ah LFP cells with liquid cooling. The specified ambient range is -30°C to 55°C, with derating above 50°C. Confirm operating limits for the actual site rather than assuming full output under every condition.
The 1.25 MW model specifies 400 V AC; the 2.5 MW model specifies 690 V AC. Connection design, handling and foundation requirements must be checked for the selected configuration. Both list Ethernet, RS485, CAN and DIDO interfaces.
400 V AC connection and 6P416S system configuration, with approximately 32.5 tonnes listed weight. Integrated battery clusters, BMS, PCS and EMS; confirm final supply interfaces in the quotation.

Specified system energy is not guaranteed usable AC energy. Confirm operating window, auxiliary consumption and acceptance conditions. Dimensions do not establish transport certification.
Discuss This Configuration →| Rated AC power | 1.25 MW |
|---|---|
| Specified system energy | 2,507 kWh |
| AC voltage | 400 V (-15% to +10%) |
| AC connection | Three-phase, four-wire |
| Grid frequency | 50/60 Hz |
| Cell | LFP, 314 Ah |
| Pack configuration / energy | 1P104S / 104.4 kWh |
| System configuration | 6P416S |
| DC voltage range | 1,040–1,500 V |
| Cooling | Liquid cooling |
| Protection: enclosure / pack | IP55 / IP67 |
| Ambient operating temperature | -30 to 55°C; derating above 50°C |
| Dimensions (W × D × H) | 6,058 × 2,438 × 2,896 mm |
| Approximate listed weight | 32.5 t |
| Altitude | Up to 4,000 m; derating above 3,000 m |
| Communication interfaces | Ethernet, RS485, CAN, DIDO |
| Protocols | Modbus RTU, Modbus TCP, CAN2.0B |
690 V AC connection and 12P416S system configuration, with approximately 45 tonnes listed weight. Integrated battery clusters, BMS, PCS and EMS; confirm final supply interfaces in the quotation.

Specified system energy is not guaranteed usable AC energy. Confirm operating window, auxiliary consumption and acceptance conditions. Dimensions do not establish transport certification.
Discuss This Configuration →| Rated AC power | 2.5 MW |
|---|---|
| Specified system energy | 5,015 kWh |
| AC voltage | 690 V (-15% to +10%) |
| AC connection | Three-phase, four-wire |
| Grid frequency | 50/60 Hz |
| Cell | LFP, 314 Ah |
| Pack configuration / energy | 1P104S / 104.4 kWh |
| System configuration | 12P416S |
| DC voltage range | 1,040–1,500 V |
| Cooling | Liquid cooling |
| Protection: enclosure / pack | IP55 / IP67 |
| Ambient operating temperature | -30 to 55°C; derating above 50°C |
| Dimensions (W × D × H) | 6,058 × 2,438 × 2,896 mm |
| Approximate listed weight | 45 t |
| Altitude | Up to 4,000 m; derating above 3,000 m |
| Communication interfaces | Ethernet, RS485, CAN, DIDO |
| Protocols | Modbus RTU, Modbus TCP, CAN2.0B |
Values transcribed from the supplied model briefs. IP ratings refer to separate enclosure and pack boundaries. Temperature and altitude limits do not imply full output at every combination of conditions.
Describe the PV generation profile, connection conditions and required operating strategy. Final design depends on the site and integration scope.
Provide tariffs, load profile and operating schedules to assess the intended charging and discharging strategy. Savings are project-dependent.
State required loads and duration. Backup suitability, islanded operation and transfer performance require configuration-specific verification.
Define the relevant market rules, control interfaces and response requirements. Participation is subject to local conditions and project approval.
The model includes a 2h designation. Actual usable energy and duration depend on operating window, power, auxiliary consumption and system conditions. Agree the measurement boundary and acceptance basis.
Request evidence covering the offered model and target market. The supplied model briefs alone do not establish certification, UPS performance or seamless transfer capability.
Project country, application, required power and energy, AC connection, load or PV profile, site layout and commissioning schedule. Identify backup or islanded requirements at the start.
ESS Procurement Evidence Checker · Commissioning Checklist · Commercial Energy Storage Solutions
Share your power, energy, connection and site requirements.
Your inquiry is submitted only after completing the contact form.